Chronology of Major Events
March 4, 2019: Taichung Port Authority Branch signed a contract with Tai-Xin
Century Wind Power for the establishment of an offshore wind power localization zone.
January 10, 2020: Taichung Port Authority Branch signed a contract with Hua Sheng
Century for the establishment of an offshore wind power localization zone.
February 26, 2020: Century Huaxin Wind Power Co., Ltd. was established.
April 1, 2020: Construction began on the Century Huaxin Offshore Wind Power
Taichung Port factory.
April 16, 2021: The Taiwan Investment Office of the Ministry of Economic Affairs approved
investments from 7 companies, with investments exceeding NT$10 billion. Among them,
Century Huaxin Wind Power introduced technology from the Danish company Welcon,
investing nearly NT$4 billion to build a production base in Taichung, strengthening
Taiwan's domestic wind turbine supply chain.
November 6, 2021: ISO 9001 certification was obtained.
April 28, 2022: Chang Hwa Bank hosted the signing ceremony for a NT$4.2 billion
syndicated loan for Century Huaxin Wind Power, a subsidiary of Century Steel Group.
August 25, 2022: ISO EN 1090 and ISO 3834 certifications were obtained.
April 11, 2023: ISO 14001 and ISO 45001 certifications were obtained.
June 19, 2024: Century Hwa Xin Wind Energy Co., Ltd. is listed on the Emerging Stock Board (ESB) for over-the-counter (OTC) trading.